Monday 22 July 2013

Knock, knock. Who's there?

The engineer.

Finally the engineer turned up tonight. He said the plans should be done by Friday. Great :)   So tomorrow I will get everything sorted for the owner builder permit and get it signed and posted off tomorrow.

That takes 2-3 weeks to get done. Once we have that hopefully the surveyor can get the building permit. But what we don't know is who does the 6 star energy rating. Dave will call the surveyor tomorrow to ask about that.